£17 million civils project demonstrating Statom capability working airside at Stansted Airport. The project aligns with the current upgrading of Stansted airport where the terminal will be extended and skylink walkway to aircraft carriers are to be rerouted. Demoforce carrying out demolition works to existing skylink removal. Franki Foundations which are carrying out piling works. This is then followed by Statom RC Frame and Groundworks which will produce the pile caps, drainage and ground floor slabs. There are various locations scattered across the airport which these works are associated with. The project shows Statom’s ability to work in a challenging logistical environment coinciding with Stanstead everyday airside operations.

We Are Available