Statom Group were contracting by Weston Homes to complete Block B and Block C on the Town Quays Development. Both Blocks were 7-story RC Frames with Sloping RC Walls from 45*-60* degree inclines starting on Level 04 and terminating at Roof. The Development consisted of 147-dwellings and 4-commercial units.

Location: Barking, East London IG11
Scope of Works
  • Piling Attendance
  • Groundworks, with associated shallow/deep drainage and services
  • In-Situ Concrete Elements, (Columns and Slabs)
  • Pre-Cast Concrete Elements, (Stairs and Columns)
  • Uni-Panel/Uni-Wall Installation
  • Jumpform Cores
  • Sloping RC Walls and Valley Walls

VIEW OUR GALLERY

We Are Available