Statom Remediation has been appointed as the delivery contractor for the enabling works package at London Docks, working on behalf of St George.

This project plays a crucial role in preparing the site for future construction, ensuring all groundwork and essential site preparation activities are carried out efficiently and to the highest standards.

Location: Tower Hamlets, E1W
Scope of Works
  • Hardstand breakout
  • 45,000m3 bulk excavation
  • Obstruction removal
  • Crushing 6,000m³ of concrete for reuse on-site
  • High- and low-level pile mat formation
  • Archaeological attendance
  • UXO (Unexploded Ordnance) attendance
  • Construction of a capping beam
  • Temporary works design and installation of a king post restraint system