Statom Remediation has been appointed as the delivery contractor for the enabling works package at London Docks, working on behalf of St George.
This project plays a crucial role in preparing the site for future construction, ensuring all groundwork and essential site preparation activities are carried out efficiently and to the highest standards.
Location:
Tower Hamlets, E1W
Scope of Works
- Hardstand breakout
- 45,000m3 bulk excavation
- Obstruction removal
- Crushing 6,000m³ of concrete for reuse on-site
- High- and low-level pile mat formation
- Archaeological attendance
- UXO (Unexploded Ordnance) attendance
- Construction of a capping beam
- Temporary works design and installation of a king post restraint system